We provide MEP engineering for industrial and manufacturing facilities: HVAC, electrical and plumbing design, fire protection and utilities, coordinated in one 3D model so the systems fit together and clash on screen, not on site.

MEP Engineering Scope

The building and process-support systems a plant depends on, designed together.

MEP
Design
Ventilation & cooling design
01
Cleanroom air & pressure control
02
Contaminant capture & extraction
03
Steam, chilled water & compressed air
04
Water supply & drainage
05
Fire water supply & pumping
06
07
Fixed fire suppression
08
Fire & gas detection
09
Power distribution design
10
Classified-area electrical design
11
Lighting & standby power
12
Energy monitoring & control
Systems Mapping

MEP Engineering Systems & Deliverables

The systems we design, what each one delivers, and the design basis behind it.

Service Area
What We Deliver
Where It Applies
Engineering Detail

HVAC and air handling

Mechanical & HVAC
Heat-load calculations
Air-handling plant selection
Duct layout and quantities
Production halls, laboratories, warehouses and offices.
⚙️

Scope & Configuration

Ventilation, cooling and humidity control matched to the heat and contaminant load of each space.

Design Basis

Process and equipment heat loads, occupancy, required temperature and humidity, and air-change rates.

📐

Method & Approach

Calculate loads, select air-handling and cooling plant, lay out ducting and air distribution, and coordinate routes with structure and pipework.

Risk & Quality Controls

Pressure relationships and make-up air are set so contaminants do not move between areas.

Cleanrooms and controlled environments

Mechanical & HVAC
Room classification and zoning
Pressure cascade design
Filtration scheme
Pharmaceutical, cosmetic and other controlled-environment manufacture.
⚙️

Scope & Configuration

Air cleanliness, pressure and flow between rooms designed for the product and the applicable standard.

Design Basis

Product risk, the applicable classification standard (for example ISO 14644) and the flow of people and material.

📐

Method & Approach

Define zones from the process flow, set air changes and pressure differences, and design filtration and airlocks.

Risk & Quality Controls

Monitoring and alarms are specified for pressure, temperature and humidity.

Contaminant capture and extraction

Mechanical & HVAC
Capture hood and duct design
Collector and fan selection
Extraction layout and quantities
Powder handling, solvent and fume sources.
⚙️

Scope & Configuration

Capture contaminants at the source and carry them to treatment safely.

Design Basis

Material properties, source locations and capture velocities.

📐

Method & Approach

Design hoods and ducts to the contaminant, size fans and collectors for the airflow and pressure drop, and provide explosion protection where combustible dust or solvent vapour is present.

Risk & Quality Controls

Combustible dust and flammable vapour hazards are assessed before equipment is selected.

Power distribution

Electrical
Connected-load schedule and demand study
Power-distribution schematics
Supply, transformer and cable design
New plants and expansions.
⚙️

Scope & Configuration

Power supply and distribution from the incoming supply to each load.

Design Basis

Connected loads, diversity, supply voltage and fault levels.

📐

Method & Approach

Prepare the electrical load list, size transformers and standby supply, design distribution and cables, and specify switchgear and panels.

Risk & Quality Controls

Protection coordination and earthing are designed with the distribution, not added afterwards.

Hazardous-area and lighting design

Electrical
Equipment selection for classified areas
Lighting layouts
Emergency lighting
Plants with flammable liquids, gases or dusts.
⚙️

Scope & Configuration

Electrical equipment and lighting suited to the area classification and the tasks performed.

Design Basis

Area classification drawings and the required light levels.

📐

Method & Approach

Select equipment protection methods to the zone, lay out lighting for the task and for emergencies, and design cable entries and sealing to suit.

Risk & Quality Controls

Equipment certification is checked against the zone classification and the gas or dust group.

Fire water supply and distribution

Fire protection
Fire water demand and storage
Pump arrangement and sizing
Distribution network layout
Plants, tank farms and warehouses.
⚙️

Scope & Configuration

Water supply and distribution for firefighting.

Design Basis

Hazard classification, the governing code and the largest credible fire scenario.

📐

Method & Approach

Determine the design fire scenario and demand, size storage and pumps (main, standby and pressure maintenance), and lay out the ring main and hydrants.

Risk & Quality Controls

The governing standard (for example NFPA or the local code) is agreed at the start.

Fixed fire suppression systems

Fire protection
Sprinkler design
Foam and water-spray systems
Hydraulic calculations
Warehouses, flammable-liquid storage and process areas.
⚙️

Scope & Configuration

Fixed fire suppression matched to the hazard.

Design Basis

Commodity or fluid hazard, storage arrangement and building geometry.

📐

Method & Approach

Select the system for the hazard, carry out hydraulic calculations, and coordinate pipework with structure and other services.

Risk & Quality Controls

System design follows the governing standard and the insurer’s requirements where they apply.

Fire detection and alarm

Fire protection
Detection layout
Alarm and evacuation design
Panel and cause-and-effect
All buildings and process areas.
⚙️

Scope & Configuration

Detect fire and gas early and alert people and systems.

Design Basis

Area use, hazards and the required response.

📐

Method & Approach

Select detector types for each area, lay out zones and alarms, and define the cause-and-effect between detection, alarms and shutdown.

Risk & Quality Controls

Flammable and toxic gas detectors are sited from release and dispersion considerations.

Water supply, drainage and utilities

Plumbing & utilities
Water supply and drainage layouts
Utility distribution design
Pipe routing drawings and quantities
Process support and welfare facilities.
⚙️

Scope & Configuration

Water, drainage and utility services (steam, compressed air, chilled water) to each point of use.

Design Basis

Demands, pressures, and the drainage and effluent segregation philosophy.

📐

Method & Approach

Size and route services, separate process, storm and effluent drainage, and coordinate with the 3D model.

Risk & Quality Controls

Process and effluent drains are kept separate from storm water.

How an MEP project runs

Stainless steel vessels and blue pipework on multi-level platforms in a process plant
Phase 02

DESIGN

Chemical plant construction site with structural steel, pipe racks and a mobile crane
Phase 03

COORDINATE

Skid-mounted pump and valve station with stainless steel pipework in an industrial hall
Phase 04

COMMISSION

MEP Engineering

Systems That Fit and Work Together

Mechanical, electrical, plumbing and fire systems share the same ceilings, rooms and risers, so they are designed against one model.

Scroll to follow the workflow
MEP services in an industrial building: insulated HVAC ducts, red sprinkler pipework and cable trays
01 Basis

Design Basis & Load Assessment

Fix the design conditions, loads, standards and the hazard classification that each system will be designed to.

Speak With Our Engineers
Stainless steel vessels and blue pipework on multi-level platforms in a process plant
02 Concept

Concept & System Selection

Compare system options on performance, cost and space, and agree the concept and the main plant and riser routes.

Speak With Our Engineers
MEP services in an industrial building: insulated HVAC ducts, red sprinkler pipework and cable trays
03 Design

Detailed Design & Calculations

Carry out the calculations, drawings, specifications and bills of quantities for each discipline.

Speak With Our Engineers
Stainless steel vessels and blue pipework on multi-level platforms in a process plant
04 Coordination

3D Coordination & Clash Review

Combine all systems in one 3D model, resolve clashes and check access for installation and maintenance.

Speak With Our Engineers
Chemical plant construction site with structural steel, pipe racks and a mobile crane
05 Delivery

Procurement & Installation Support

Compare vendor offers, review shop drawings and inspect installation against the design.

Speak With Our Engineers
Skid-mounted pump and valve station with stainless steel pipework in an industrial hall
06 Handover

Testing, Commissioning & Handover

Witness testing and balancing, verify performance against the design basis, and hand over documents and training.

Speak With Our Engineers
Let's Collaborate

Planning a new facility or an upgrade?

Tell us about the building, the process load and the standards that apply, and we will outline the MEP scope and the design basis.

Discuss an MEP Project
Knowledge Base

Utilities & Facilities Knowledge Base

Cooling, boiler, cleanroom and equipment guides from our technical team.

FAQ

Frequently asked questions

Straight answers to the questions we hear most often.

What does MEP engineering cover?

MEP stands for mechanical, electrical and plumbing. In an industrial facility it usually includes HVAC, electrical distribution and lighting, plumbing and drainage, fire protection and the utilities that support the process, designed so that they fit within the building and work together.

Why coordinate MEP systems in a 3D model?

Ducts, pipes, cable trays and sprinkler mains compete for the same space. Modelling them together lets clashes and access problems be found and fixed on screen, which avoids rework during construction.

How is fire water demand determined?

It is set by the hazard classification of the site or building, the largest credible fire scenario and the governing code, such as NFPA or the local regulation. Storage volume and pump capacity are then sized to supply that demand for the required duration.

What is a pressure cascade in a cleanroom?

Rooms are held at different pressures so that air flows from cleaner areas towards less clean areas. The pressure differences between adjacent rooms and airlocks are designed and monitored to keep contamination out of the cleanest space.

Why does hazardous-area classification matter for electrical design?

Where flammable gases, vapours or dusts can be present, electrical equipment must not become an ignition source. The classification of each area decides which protection methods and equipment certifications are allowed.

Can you design for an existing building?

Yes. For existing plants, 3D laser scanning can capture the building and services as they are, so that new systems are designed to fit and tie in with minimal disruption.

Contact Details

Reach us directly.

Prefer a direct line? Reach our formulation team through any channel below — we typically respond within one business day.

Message on WhatsApp